As a global leader in delivering sustainable offshore projects for the energy sector, Subsea 7 has built its success on engineering expertise and specialist technologies. So when the company was looking at energy use in its Aberdeen East Campus office, the facilities team realised that they needed to upgrade the chiller system serving the 4-storey building.
One of the old Climaveneta chillers has now been replaced with six 180kW modular e-Series chillers - the first R32 units to be installed in the UK. These modern, inverter-driven chillers are specifically designed to modulate the cooling load to match the demands of the building.