The Challenge
Speed of installation was a key requirement for this project so that it could adhere to the programme set out by builder Brookfield Multiplex. This gave the installer three to four weeks to completely install the air conditioning on each floor. At the same time, a high-end finish was required demanding the best possible quality of installation.
Mixed-use buildings such as 48 Leicester Square also require cooling in some areas and heating in others, even in adjacent rooms, demanding a flexible, fully controlled system that delivers complete comfort in the most energy efficient way possible.