The Challenge
With the site located less than a mile from the sea, the existing units had become unreliable because of the high salt content in the atmosphere and the Trust needed a suitable replacement that could not only cope with a harsh environment but also had a strong emphasis on energy efficiency, reliability and in-built resilience.
The Trust also needed it to be fitted and supported by a manufacturer that could deal with every aspect of the design in a secure, restricted facility and cope with the M&E and plumbing installation involved in the on-site works.
![Dewnans centre Dewnans centre](/assets/Uploads/Dewnans-centre__ScaleWidthWzEyODBd.png)